Self-installation in 7 Easy Steps

Pool Image
How it works

Fast & Simplified Installation

Fibro pools and spas are installed in one day using a simple, standardized 7-step process that works on all soil types. Before starting, have a leveling tool, 0.5-inch crushed stone, the MIRAFI geotextile membrane, and the 10-inch dewatering well ready. Fibro provides PDF guides for installation, opening, and maintenance.
01
Plumbing and Planning
Well-structured information

Complete the first pipe connections in advance to allow the glue to fully cure before the pool shell installation.

Plan the filtration system location
Dig and bury the piping trench
1
Installation Image
02
Excavation
Excavate beyond the pool size
Template not required for flat-bottom rectangular models
Adjust excavation depth based on soil type
Plan skimmer and dewatering well locations
Maintain proper final pool elevation
2
Installation Image
03
Preparing the Stone Bed
Install the Geotextile Membrane
Add Rocks to Create the Stone Bed
Level the Stone Bed
3
Installation Image
04
Setting Up The Pool
Lower the Pool Carefully
Check Base Support
Verify Level and Height
4
Installation Image
05
Filtration System
and Plumbing.
Finalize the plumbing between the pool and the filtration system
No Adjustments Required
5
Installation Image
06
Installation of the Dewatering Well/ Manhole Well
Install the Dewatering Well
Position the Well Correctly
Set the Proper Depth
6
Installation Image
07
The Backfill
Pre-Fill the Basin
Backfill with Crushed Stone Only
7